Without this, the washing machine must not be placed on the balcony!
Sewer drains on the balcony LED Light Pad, tracing light pad, light box for tracing, tracing light board A3 Led Light Pad,A3 Led Drawing Pad,A3 Led Copy Board,Led Artist Stencil Light Board Guangdong Jishengke Industrial Co., Ltd. , https://www.suronart.com Method: If a balcony is changed into water, the leveling layer around the floor drain must be knocked out first. Carefully expose the floor drain. Then add a three-way connector to the floor drain so that you can follow different directions according to your own needs. In charge of it.
However, there are many details that need attention. The sliding door of the balcony must have a ridge so that the balcony can be covered with the sewer pipe and the height of the living room floor will not be exceeded. And there is also a point Xiaobian must remind everyone that the balcony floor must be much lower than the living room floor! And the balcony of the water pipe also needs to be slotted, we have to try to let the drain pipe close to the ground.
Method 2 If the difference between the ground level of the balcony floor of the house and the height of the living room is not enough, especially when the height of the balcony sliding door is relatively appropriate, the PVC pipe is preferably provided under the balcony.
However, this method is the same as the method one. Be careful to break out the floor drain first, and also need to slot the floor, then lay down the PVC40 downpipe, so the height of the ground is much smaller. This method is used by many owners. Basically, it did not affect the living of the later period.
In addition, the balcony after the transformation of the water, the latter part of the waterproofing project is actually very important, do not look at the waterproof engineering every day put in the mouth, or someone does not pay attention, Xiao Bian again remind everyone that the balcony must do a good job of draining Oh!